Investment disclosures.
The assumptions, risks, current status and data practices supporting the Open Mine investment brief. Updated 31 October 2026.
Operating snapshot and metric definitions.
The highlighted routed-hashrate metric is 116.24 PH/s, calculated from Stratum production provider_worker_minute_buckets in a repeatable-read, read-only transaction. The period is 30 October 2026 14:38 UTC to 31 October 2026 14:38 UTC: all 1,440 complete minute buckets, 86,400 seconds. Total recorded ingress work is 10,043,179,438.3 TH; dividing by 86,400 gives 116,240.5 TH/s. It includes all provider ingress and provider default/self-mine flows. It measures routed workload, not customer-paid delivery, marketplace sales or nominal registered fleet capacity.
The public card displays the rounded value 116.2 PH/s. Four provider accounts have worker-minute records in this interval. The separate public marketplace shows four providers with live offers: Cyberian Mine, NMine, ValueHash and Hashlabs. This is the scope of the four-provider campaign headline. The registry contains six active provider records; registry membership, current ingress and marketplace listings are distinct scopes. Everminer remains visible in Stratum traffic but was not among providers with purchasable marketplace offers in the observed view.
The registered-inventory snapshot collected on 31 October at 12:28 UTC remains 470 miners and 124 registered users (123 with active status). Five provider records hold inventory. Cyberian Mine has 435 of the 470 miners. The inventory contains 421 miners marked mining and 429 with a client owner. Registered users are not a paying-customer count.
Historical comparison metrics remain available for diligence: registered nominal capacity is 98.635 PH/s; customer-miner daily delivered work for 30 October averages 70.985109 PH/s across 431 daily records. These measures have different scopes from all-provider ingress. The earlier campaign displayed them side by side; the current campaign highlights ingress to show workload passing through the routing infrastructure.
Real paying customers and more than six months of live operation of Open Mine's proprietary Stratum routing proxy were confirmed by the founder on 31 October. The duration describes operating experience, not uninterrupted uptime or an independent certification. The current $500,000 growth budget and the historical 414-device CM roadmap reference are unchanged.
Activation, warranty and failover.
The campaign describes the same lifetime warranty and automatic hashrate failover concept as the live Open Mine homepage. Warranty is a provider service promise while the miner remains hosted with that provider and the account meets its hosting terms. The provider manages repairs, spare parts, maintenance and replacements. Ownership/title and service rights depend on the applicable miner and contracts; legacy CM service positions require their own mapping.
Available hashrate is shared proportionally within the same provider. A single ASIC breakdown affects shared capacity rather than assigning the entire interruption to one client. This is not automatic cross-provider replacement or guaranteed 100% delivery. If an entire provider fleet stops, its allocations can reach zero. Provider-specific terms and available capacity remain relevant.
Instant activation requires a connected miner, a valid pool destination and the required funded service balance. Mining may pause below the security buffer. Pool statistics update as accepted shares accumulate. The interactive module uses five equal 200 TH/s ASICs and five equal client allocations within one provider; it is an illustration adapted from the homepage concept, not live readings or an output guarantee.
The Stratum images are genuine captures of the public read-only interface with generic client labels. Captured values are dated snapshots; the link opens the current dashboard. The marketplace image is a genuine unfiltered public view captured 2 November 2026, sorted by highest hashrate. Its headline showed four providers, eleven offers and forty-three available miners at capture time; the viewport shows the first listings, not every catalogue row. Older S21-only imagery is superseded. Public screenshots do not establish future performance, future listing prices or a new independent-customer count.
Sources: homepage illustration, delivery terms, warranty and downtime guide, Stratum dashboard, marketplace.
Round and legal status.
The proposed round is $500,000 at $2 million post-money ($1.5 million pre-money). At a full close, new investors would hold a combined 25% before other rights and future financing. $2 million is the founder's selected valuation for discussions, not an independent appraisal or a valuation derived from a verified earnings multiple.
A separate Open Mine legal entity has not yet been formed. Issuer jurisdiction, investment instrument, rights, conversion terms, dilution protections, the ownership register and applicable investor eligibility and offering requirements remain to be determined and documented. Rights to code, domain and contracts must be established. No subscription, share transfer or related investment transaction is represented as executed.
The ownership calculator divides an indicative USD contribution by $2 million. $10,000 therefore represents 0.5% and $50,000 represents 2.5%, before other rights and subsequent dilution. It illustrates direct equity participation; a different instrument or final documents may change the result. No equity is legally reserved by submitting the form.
A soft commitment is a preliminary, non-binding expression of interest, not a signed subscription or an obligation to invest. The public total includes active submissions after personal confirmation of the contact and amount. It does not represent funds received, signed contracts, independently verified demand or available company cash. Withdrawals are excluded; changes require confirmation again. No funds are accepted on this page.
Interested investors will receive detailed financial materials and transaction documents before an investment decision. Bitcoin contributions, exchange-rate fixing, treasury arrangements and applicable identification checks have not been selected. A process without KYC is not promised. A personal SAFE in place of a company instrument has not been approved.
Raising $100,000 or $200,000 would not automatically activate the full $500,000 budget. A minimum viable raise, staged spending and any revised CM allocation require a separate decision and updated investor disclosure. An automatic minimum-close arrangement has not been agreed.
The minimum indicative investment in the Open Mine round is $10,000. This page collects non-binding expressions of interest.
Open Mine platform unit economics.
The current marketplace terms charge a 5% agency fee on amounts collected and settled on a participant's behalf, including primary sales and resales. Provider settlements include hosting and storage charges less the marketplace fee. Customer-facing prices are set by the provider or seller. Gross equipment sale proceeds, hosting billings and prepaid customer balances are not themselves Open Mine fee revenue. Mining-pool Bitcoin payouts go to customers and are not a platform revenue stream.
The four-year model uses the existing 26 October planning reference: Antminer S21 XP, 270 TH/s, 3,645 W, $3,220 primary price and $0.069/kWh hosting. Primary-sale commission is $161. One completed resale at 25% of the original price is $805, generating a $40.25 commission. At full reference delivery, daily gross hosting is $6.03612; a month uses 365/12 days, giving $183.59865 gross hosting and $9.1799325 platform fees. Four years use 48 months / 1,460 days: hosting fees total $440.63676. Modelled gross platform fee-revenue LTV per additional miner is $161 + $40.25 + $440.63676 = $641.88676, displayed as $641.89. Calculations use unrounded amounts, so multiplying the rounded monthly fee may give a different result.
The owner-selected assumptions are one new paid primary sale, one resale at 25% of original price, and four years of hosting at a fixed reference tariff, power and 100% delivery. This is an undiscounted fee-revenue scenario, not observed lifetime value, verified four-year retention, a margin or a profit forecast. The four-year hosting total spans the same physical miner before and after resale and is counted only once. Resales are earned only on completed transactions. No extra purchases, additional resale cycles, storage, cancellation, pool-service, Virgin Coin, hashrate-markup, SaaS, licensing or equity income is included. Prepaid-for-life equipment has no separate daily hosting charge. Inactive periods, lower delivery, refunds, economic shutdown and commercial-rate/fee changes alter the result.
The portfolio-size proxy is a repeatable-read, read-only Open Mine production snapshot at 2 November 2026 17:00:52 UTC: 434 client-owned miners across 49 distinct active, unmerged owner accounts; 434/49 = 8.857142857142857 miners per owner, displayed as 8.86. The cohort includes seven paused devices and two client-owned devices listed for resale; provider-owned unassigned inventory and zero-miner registered accounts are excluded. Median ownership is four devices. Owner accounts are not independently attributed new cash buyers: existing migrations remain in this ownership snapshot and are not counted as new primary-sale revenue.
Modelled customer fee-revenue LTV is $641.88676 multiplied by the exact 434/49 portfolio ratio = $5,685.282731428571, displayed as $5,685.28. This is a customer-equivalent fleet-sizing illustration for additional business at the current mean ownership, not a measured single-customer retention cohort. After resale, the device may belong to another customer. Consequently, the full miner lifecycle must not be independently attributed to both original and resale buyers or summed again across those customer identities. Current portfolio size does not establish future purchase size, a cash-funded acquisition cohort, repeat purchase rate or a CAC/LTV contribution ratio.
The contribution bridge is a management view: fee revenue less attributable acquisition/referral incentives, payment/network/settlement costs, routing/cloud infrastructure and support; then ongoing engineering, salaries, legal, administration and taxes. Cost classification must avoid counting a cost twice. Provider electricity and equipment costs are part of the provider's economics, not all Open Mine's own operating expense. A complete reconciled platform cost allocation, customer acquisition cost, retention cohort, contribution margin, observed retention-based lifetime value, payback period and break-even volume have not yet been established. No quantified profitability or margin claim is made by this example.
Open Mine's proposed 20% Cyberian Mine participation is a separate capital allocation. CM programme earnings and possible future distributions must not be included in marketplace unit revenue or counted again as platform commission. Standalone routing SaaS, licensing and other product extensions remain opportunities to validate rather than current independent recurring revenue. Sources: marketplace terms and pricing; the reference inputs match the retained 26 October equipment model.
Programme model and assumptions.
All four Cyberian Mine programme outcomes use the same proposed $200,000 allocation. Annual Open Mine fees for 0 / 2 / 4 / 6 sales cycles are $9,423 / $35,842 / $66,129 / $96,405. Attributed 20% shares of incremental CM programme earnings are −$1,910 / $20,092 / $31,314 / $42,497. Combined economic contributions are $7,512 / $55,934 / $97,443 / $138,902. Rounding can produce a $1 difference. Scenario probabilities have not been estimated; the highlighted four-cycle case is for readability.
Fees are before Open Mine's own operating costs and taxes. CM programme earnings are incremental, before taxes and unallocated central overhead, not whole-company CM net profit. Combined economic contribution is not platform revenue, free cash, cash dividends or an investor return. A 20% economic participation does not create automatic dividend payments.
The model uses 414 commercially active CM devices and normalized delivery for 25 October. The S21 XP 270 TH/s benchmark is $2,835 landed and $3,220 retail, electricity $0.053/kWh and maintenance 2% of landed cost per installed device-year. A 36-month economic wear period applies only to retained, unsold equipment. These planning inputs require rechecking against actual procurement and operation.
$200,000 covers 70 devices and raises modelled hashrate coverage from 75.1% to 96.6%, not 100%. Full recovery requires 82 devices / $232,470. The additional $32,470 and its funding source need to be documented. Unsold output must be dedicated to existing customer recovery; ordinary self-mining by itself does not generate hosting commission. Dedicated recovery capacity must remain or be replaced as devices sell, and delivery must be recalculated when sales add customer entitlements.
In the no-sales case, CM's $56,598 operating cash contribution is reduced by $66,150 of economic wear, producing the negative attributed 20% earnings share. The no-sales case is not a guaranteed worst case. Retained equipment and the original capital are not added again to cash returns. Capital recycled through subsequent equipment batches stays inside CM rather than becoming Open Mine's free budget.
Related-party investment
The proposed $200,000 primary investment for 20% of CM accounts for 40% of Open Mine's round. It implies $800,000 pre-money / $1 million post-money CM and is separate from the EUR terms of the standalone CM investment room. It is not founder secondary proceeds. The anchor-provider showcase and its ability to attract other providers remain hypotheses.
The asset and liability perimeter, review of terms, related interests, approval rules, procurement milestones, complementary recovery funding and use-of-funds controls require documentation before execution. The transaction has not been executed. Company ownership of every fleet record must not be inferred; legacy customer positions and service obligations require their own mapping.
Roadmap and operating evidence.
The 414 → 900 → 1,800 → 2,900 → 4,140 sequence is a 12-month management target, not contracted demand. The base of 414 is a migrated CM reference cohort, not new sales or a certified platform-wide paying-customer fleet. Four CM cycles supply 280 gross sales, leaving 3,446 additional devices through other providers and channels if the entire cohort is retained.
New external buyers, collected receipts and fees, actual delivery, retention, all-in acquisition costs including incentives and contribution after costs must be measured separately. Migrations, manual/internal credits, user registrations and provider billings are not proof of organic sales or revenue. Fee recognition, full costs, independent-buyer attribution and unrestricted company cash still have reconciliation gaps.
The $20 million Series A post-money valuation in 12 months is a management target. $4 million of new capital with 20% dilution is an illustration, not agreed future terms. Fleet growth does not automatically establish valuation. There is no assumed liquidity, option pool, other conversion or pro-rata reinvestment. In that illustration, $10,000 would become 0.4% and $80,000 of paper value (8×), not sale proceeds or a promised return.
4,000-device capacity-equivalent illustration
The $10.096 million whole-fleet equivalent GMV and $504,812 hypothetical 5% sales fees use the nominal fleet mix with an S21 XP benchmark of $3,220 / 270 TH/s. This is not a mixed-fleet appraisal or stored migration pricing. Fees on the 3,586 future units beyond the original 414 are $452,564; migration is not new GMV.
At full delivery, monthly hosting is $707,480 and the platform fee $35,374 ($424,488 annualized run-rate). At a 75.1% delivery sensitivity, the fee is approximately $26,572 per month. Months use 365/12 days. Exit run-rate is not earned first-year revenue. Fees are before Open Mine's costs and tax; the 20% CM earnings share is not included in this fleet illustration.
Technology and development status.
Routing, allocation and delivery controls require continued hardening and operation. Open Mine's proprietary Stratum routing technology uses time-sliced client TH/s allocation with pool-accepted, difficulty-weighted work and delivery-debt feedback. We do not claim the world's only proxy, patent protection or that competitors cannot copy the system.
Standalone SaaS products and licensing are opportunities to validate, not live standalone revenue streams. Complete provider-scoped authorization for an external router SaaS API has not yet been implemented.
Open Mine's stablecoin payment software is separate from self-hosted open-source BTCPay and LND. Avoiding an external percentage processing markup does not eliminate network, liquidity or operating costs.
Max Matrenitski is Open Mine's solo founder and leads product, technology, commercial direction and fundraising. The founder designation describes the founding role; contributor/vendor arrangements, future resourcing, time commitments, costs and operational dependencies remain part of the investment diligence. The campaign does not claim a quantified AI productivity or staffing-cost advantage.
Customer focus and growth strategy.
The customer segments, channel mix, first-90-days growth programme and long-term vision describe management's proposed commercial strategy. They are not signed distribution contracts, a committed provider pipeline or a forecast of channel performance. The 90-day sequence starts with the growth programme rather than declaring that all activities have already begun.
The stated $100,000 customer-acquisition and $35,000 provider-success allocations are existing lines within the fixed $500,000 round. No new channel-level budget or separate funding round is introduced. Future channel spending should be evaluated against actual funded purchases, external receipts, collected fees, acquisition incentives, retention and contribution after costs. The separate unit-economics section publishes an explicit assumption-based fee-revenue LTV; no observed retention LTV, quantified CAC, conversion rate or guaranteed provider sales is established.
The alternatives table compares customer routes at a category level. It is not an exhaustive named-competitor feature audit or a claim that other operators cannot provide similar features. Customer-focus copy does not quantify total, serviceable or obtainable market size, and the roadmap remains a management target rather than a market-share forecast. Market sizing and historical revenue/cohort reporting require their own documented evidence.
Investment and operating risks.
Bitcoin price, network difficulty, energy tariffs, ASIC wear, downtime, provider performance and obligations, equipment sourcing, resale liquidity, customer demand and execution affect outcomes. Delays, additional funding requirements and a complete loss of investment are possible.
The founder's thesis is to prepare before a possible future wave of Bitcoin demand over a one-to-two-year horizon. The market has not been established to be at a bottom, and neither a recovery nor its timing is certain. Purchase economics must be checked for every batch.
Returns, dividends, buybacks and a liquid market for the investment are not guaranteed. A target future valuation is not a price at which an investor can sell a stake. Resale and auction tools for mining positions do not guarantee buyers or immediate exits, and do not create liquidity for shares in Open Mine.
Your data and contact.
Your name, email, Telegram, indicative amount, timing and message are stored on the server for Max to review for investment discussions. Only aggregate confirmed interest and approved questions and answers are published. Individual contact details and amounts remain private.
Questions go to Max for review. A question may be edited to remove personal data and published with an approved answer; the sender's name and contact details are not published. A real-time community chat is not currently offered.
There are no automatic mailing campaigns or sharing of contacts with other investors. No automatic confirmation email is sent. A private code is stored in your browser and provides access to edit or withdraw your submission; the server stores its hash. Keep your code safe. If it is lost, contact Max for assistance.
If you arrive through a campaign link or from another site, a first-party cookie remembers the campaign labels, referring site, landing page and time for up to 90 days. It is shared with openmine.io and its subdomains so the marketplace can remember which source brought you. The marketplace clears this shared cookie on your next page visit. Creating an account or signing in clears both campaign cookies.
For access, corrections, deletion requests or questions: max@cyberianmine.de. Deletion requests are handled personally; an automatic retention period has not yet been established. Withdrawal excludes an expression of interest from the total but does not itself delete contact details.
Hosting and database infrastructure are provided through Sites / Cloudflare. A daily hash of a network identifier is used to limit spam. Anyone who receives the campaign link can access the public page; this does not grant access to private submissions or the detailed Data Room. Private customer records and underlying banking evidence are not published.
The warranty/failover explanation and Open Mine introduction use standard privacy-enhanced YouTube players from the owner-confirmed official channel @OpenMine_io. Their previews load when the players become visible; YouTube receives the network information needed to display and play the videos. The muted, looping world-tour film is served by Open Mine and can be paused. Clicking Continue in the amount calculator opens the contact form without submitting interest or transferring funds.